MEXICO — The Peru-Mexico bridge will be closed from 6 p.m. Thursday to 6 a.m. Friday.
Closure is required to allow continuation of the replacement of the Webb River Bridge and the road on the Mexico side.
MEXICO — The Peru-Mexico bridge will be closed from 6 p.m. Thursday to 6 a.m. Friday.
Closure is required to allow continuation of the replacement of the Webb River Bridge and the road on the Mexico side.
Comments are no longer available on this story