1 min read
Structures are taking shape Wednesday at the site of the new Edward Little High School on Harris Street in Auburn. The $104.7 million project began in March and is expected to finish by the start of the 2023-24 school year. Over 100,000 cubic yards of ledge were removed and over 200,000 cubic yards of fill were added along with massive retaining walls. The old school will eventually be demolished and new athletic fields built. Visit sunjournal.com to watch a video flyover from Wednesday afternoon and find links to plans, photos and more information. Russ Dillingham/Sun Journal
Structures are taking shape Wednesday at the site of the new Edward Little High School on Harris Street in Auburn. The $104.7 million project began in March and is expected to finish by the start of the 2023-24 school year. Over 100,000 cubic yards of ledge were removed and over 200,000 cubic yards of fill were added along with massive retaining walls. The old school, background, will eventually be demolished and new athletic fields built. Visit sunjournal.com to watch a video flyover from Wednesday afternoon and find links to plans, photos and more information. Russ Dillingham/Sun Journal

A lifelong resident of Lewiston, Russ stumbled into photography as a college student working toward a career in psychology. His great-grandfather Louis B. Costello was the publisher of the Lewiston Daily...

Comments are no longer available on this story