You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
The size of the new Edward Little High School on Harris Street in Auburn is seen Monday as framework for roofing goes up. The $104.7 million project began in March and is expected to be completed by the start of the 2023-24 school year. The old school on the site will eventually be demolished and new athletic fields built. Russ Dillingham/Sun JournalThe size of the new Edward Little High School on Harris Street in Auburn is seen Monday as framework for roofing goes up. The $104.7 million project began in March and is expected to be completed by the start of the 2023-24 school year. The old school on the site will eventually be demolished and new athletic fields built. Russ Dillingham/Sun Journal
A lifelong resident of Lewiston, Russ stumbled into photography as a college student working toward a career in psychology. His great-grandfather Louis B. Costello was the publisher of the Lewiston Daily...
More by Russ Dillingham
Comments are no longer available on this story