1 min read

A panoramic view Monday morning shows progress on the construction of the athletic fields, bottom and left, and the newly paved parking lot at the new Edward Little High School in Auburn. The school and turf field are expected to be ready for students in fall 2023. Russ Dillingham/Sun Journal
A panoramic view Monday morning shows progress on the construction of the athletic fields, bottom and left, and the newly paved parking lot at the new Edward Little High School in Auburn. The school and turf field are expected to be ready for students in fall 2023. Russ Dillingham/Sun Journal

A lifelong resident of Lewiston, Russ stumbled into photography as a college student working toward a career in psychology. His great-grandfather Louis B. Costello was the publisher of the Lewiston Daily...

Comments are no longer available on this story