You have a registered email address and password on pressherald.com, but we are unable to locate a paid subscription attached to these credentials. Please verify your current subsription or subscribe.
Traffic on U.S. Route 2 in Dixfield on Thursday follows a truck spraying water on the east-west highway to reduce dust from ongoing work to reconstruct a section of the highway where a new, two-lane bridge was installed over the Webb River.
A crew laying 900 feet of sewer line extension from Dixfield into neighboring Mexico watch Thursday morning as an excavator operator moves a pre-cast concrete pipe section into place at the intersection of U.S. Route 2 and Leavitt Street in Mexico. Old sewer piping is being replaced in the extension project from the Blue Moose store to the Peru bridge over the Androscoggin River.
Comments are no longer available on this story